AmphibiaWeb accounts, and the road to Milestone 2

Eleutherodactylus Research Studio · Fall 2026

Tom Devitt

2026-09-28

Where we are

  • Today: Milestone 1 (project proposals) due
  • Two things worth 15 minutes before you get back to work: your individual AmphibiaWeb account, and the path from here to Milestone 2 (Oct 21)

Part 1 — the AmphibiaWeb account

Why this is a real contribution

  • Not a class exercise you throw away in December
  • A citable, permanent publication with your name on it
  • Timeline: species claimed (done, week 2) → full draft Oct 21 → second draft Nov 18 → final draft Nov 30

What the account has to do

Five things, per the AmphibiaWeb guidelines:

  • Description — diagnostic morphology; what distinguishes your species from its closest congeners
  • Distribution and habitat
  • Natural history / life history
  • The call — only if a call description has been published
  • Conservation status

Sourcing each section

  • Description: the original species description, plus any redescriptions — start with Amphibian Species of the World for the current synonymy, then the bibliography page
  • Distribution: the original description and later papers (type locality, material examined); the IUCN Red List page is the one secondary source AmphibiaWeb accepts. No GBIF, VertNet, or iNaturalist records
  • Natural history: the original description plus any subsequent natural history notes or field guide accounts
  • Conservation: the IUCN Red List entry, if one exists — if not, say so plainly rather than guessing
  • Calls: published call descriptions only (they go under Life History). Your team’s measurements are unpublished and stay out of the account; if no call has been published, say so

Writing quality bar

  • A stub is not a passing account — this is a citable publication; cite every factual claim
  • Before you start, skim 2–3 existing AmphibiaWeb accounts for a related species — match the structure and voice
  • “I think” and unsupported inference don’t belong; if a source disagrees with another, say so and cite both

This week — individual

  • Full draft due Oct 14 — that’s 2.5 weeks from today

Part 2 — from proposal to Milestone 2

The next 3.5 weeks

Date What
Mon Sep 28 Milestone 1 (proposals) due — today
Wed Sep 30 Work session + stand-ups
Mon/Wed Oct 5/7 Reproducible workflows micro-lesson + work session
Mon/Wed Oct 12/14 Summary stats micro-lesson; AmphibiaWeb full draft due; mid-semester evals
Mon Oct 19 Micro-lesson as needed (team-driven)
Wed Oct 21 Milestone 2 — clean data + QC notebook due; in-class data audits

Milestone 2, concretely

  • “Clean data” = one CSV per team, team<N>_measurements.csv, one row per measured call
  • “QC notebook” = a rendered team-measurement-template.qmd that gets you there — every team already has this file
  • The path is the template’s own steps — it is your roadmap, not a separate thing to design

The template is your roadmap

  1. Assign recordings among the team (who measures what)
  2. Look before you select: overview spectrogram → pick a clean window
  3. Steward merges everyone’s selections_<initials>.csv
  4. Measure every call: duration, rate, dominant frequency
  5. Spot-check outliers (>2 SD) against the spectrogram — a number is not a measurement until you’ve looked at where it came from
  6. Summarize by male, then by species; one first-look figure
  7. Stand-up: done / in the way / next

What “done” looks like by Oct 21

  • Every file in your team folder has been through step 2 — or has a documented reason it can’t be (see your roster’s loose ends)
  • One merged measurements CSV and a rendered notebook, in your team folder
  • Outliers checked, not just computed
  • Your roster’s known gaps (missing files, missing temperature) are in the notebook as stated caveats — not surprises in November

Team-specific gaps and this week’s task

  • Every team’s internal roster now has a “This week” box at the top — that’s where to start, not the proposal you just turned in
  • Two kinds of gap on every roster:
    • Yours to work around — format limits, small samples, sourcing: start measuring anyway, document the limit in your methods
    • Mine to unblock — missing files, unconfirmed metadata, external material: I’m chasing these this week; don’t wait on them to start measuring what you already have

Team 2’s temperature calibration

  • E. marnockii is Team 2’s own species, confirmed calling at BFL itself (a 2024 voucher)
  • The PAM archive’s detector work is real but still thin: one pilot night, no validated threshold yet. Not a route to a temperature range this week
  • Instead: field-notebook temperatures for Team 2’s own vouchers, correlated against calls they’ve already measured. Likely small N; say so plainly rather than force a curve

Wednesday’s stand-up

Bring three things: what’s measured, what’s blocked, what you need from me. I’ll circulate during work time — flag your roster’s “Mine to unblock” items if I haven’t already gotten to them.